top of page

PROJECT 1: DESIGN MODIFICATION AND DOCUMENTATION

 

 

THIS PROJECT AIMED TO EXPOSE STUDENTS TO RECENT AND MORE COMPLEX BUILDING TECHNOLOGIES INCLUDING BASEMENT CONSTRUCTION, AND METHODS OF DOCUMENTATION. A MODIFICATION OF SEMESTER 4 DESIGN STUDIO PROJECT WAS CARRIED OUT IN ORDER TO ADOPT DIFFERENT, MORE RECENT AND COMPLEX CONSTRUCTION SYSTEMS THAT SUITS THE LOCAL CONTEXT, FACILITATED BY APPROPRIATE PRECEDENT STUDIES.

 

IN ADDITION, DETAIL  DESCRIPTION OF ALL CONSTRUCTION SYSTEMS USED AS WELL AS ANALYSIS OF THE ADVANTAGES AND DISADVANTAGES OF THE SYSTEMS PROPOSED.

 

 

PREVIOUS PROJECT: COMMUNITY CENTER

LOCATION: GOMBAK

PROJECT 2: STATUTORY REQUIREMENTS AND INDUSTRIALISED B

UILDING SYSTEM

 

A GROUP PROJECT WHICH IS RELATED ON INDUSTRIALISED BUILDING SYSTEM, UNIFORM BUILDING BY-LAW AND SITE ESTABLISHMENT. EACH GROUP WAS REQUIRED TO DESIGN A SIMPLE BUILDING USING IBS CONSTRUCTION SYSTEM AND THE DESIGN SHOULD ADHERE TO ALL THE RELATED BUILDING REGULATIONS.

 

THE OBJECTIVE IS TO EXPOSE AND ENGAGE STUDENTS IN A CRITICAL AND ANALYTICAL STUDY OF THE DIFFERENT IBS CONSTRUCTION METHODS WHILE AT THE SAME TIME BECOMING AWARE OF THE REQUIREMENTS OF UBBL.

 

 

 

REQUIREMENTS: PHYSICAL MODEL AND REPORT

bottom of page